JOIN THE COMMUNITY
Subscribe to our weekly newsletter for the lastest industry news and resources delivered straight to your inbox.
Let us know your interests:
Preferred language

Toronto’s tallest mass timber residential building tackles housing crisis

Toronto recently broke ground on its tallest mass timber residential building. The project at 230 Royal York Road is a nine-story development made almost entirely of prefabricated mass timber. Once the pieces arrive on-site, crews will have just 90 working days to get the structure up. Designed by LWPAC and built by the team at Intelligent City, the building is the first of its kind in the city: a mid-rise apartment complex constructed from engineered wood components that were built off-site using robotic machinery and AI.

Toronto’s tallest mass timber residential render

Image sourced from Intelligent City

Mass timber construction: A faster way to build housing

Toronto’s housing crunch isn’t a secret. It’s one of the most expensive cities in the world to live in, with the average detached home going for 1.44 million in 2025. This project aims to prove that prefabricated timber can scale and provide affordable housing in a market desperately needing quality housing fast. 

Windmill Developments and Leader Lane Developments have been pushing for this kind of construction since 2017, with an eye on reducing costs and schedule pressure for mid-rise residential developments. With the city and the Canadian federal government planning to invest more in housing, many hope this project becomes a model for repeat builds.

Building a mid-rise condo usually takes 18 to 24 months, depending on the size. With mass timber construction methods, this building is expected to be assembled in less than three months. Instead of waiting for traditional framing or concrete cures, windows, insulation, and interior systems follow close behind the assembly. For developers, this process shortens the time from permit to occupancy, providing the potential to quickly use capital for new projects. 

The construction process at 230 Royal York Road

The process to build Toronto’s tallest mass timber residential building is different that traditional methods as that The wood components come from Intelligent City, a prefabrication plant near Toronto where robotics and AI are now part of the standard production line. Automated machines cut and pre-assemble panels, columns, and beams before being shipped to the site. That includes pre-drilling holes, integrating duct runs, and ensuring all tolerances match precisely.

For crews on-site, the building process is simplified as they simply have to put the pieces together and secure the structure. The pieces are labeled, mapped, and ready to be slotted in. According to Intelligent City, this process makes their work safer and faster.

Is mass timber the future of mid-rise condos?

Mass timber is emerging as a compelling solution for mid-rise condominium construction in Toronto, driven by the city’s urgent need for sustainable and scalable housing. With approximately 682 mid-rise buildings (5–11 stories) in the development pipeline and only 28% completed, there’s a significant opportunity to adopt faster and greener construction methods. Mass timber offers considerable advantages:

  • Carbon storage: Trees absorb carbon dioxide as they grow. When turned into timber, that carbon stays locked in the wood for decades, helping reduce atmospheric CO₂.
  • Lower emissions: Mass timber construction produces significantly fewer greenhouse gas emissions than concrete or steel production, which are highly energy-intensive.
  • Renewable resource: Timber comes from trees, which can be replanted and regrown. Sustainable forestry practices help ensure long-term availability.
  • Less construction waste: Prefabricated timber panels are cut to size off-site, which reduces on-site waste and speeds up construction.
  • Efficiency: With more work done off-site, construction is cleaner, quieter, and faster.

The province of Ontario has already completed 151 mass timber projects, with more underway, signaling growing industry confidence. Furthermore, Toronto’s updated building codes now permit mass timber buildings up to 12 stories, paving the way for broader adoption in mid-rise developments. This is a positive sign for the younger generation hoping to get into the housing market in the future. With faster build times the supply of new condos could ease the sky high price growth that has made housing so unaffordable for many in Toronto. 

Want to stay up to date on where construction is heading? Subscribe to Under the Hard Hat’s newsletter and get stories like this straight to your inbox. Whether you’re on the tools or behind the drawings, it’s worth the read.

Share Your Thoughts

The best Bosch tools under $100 for construction professionals and DIY enthusiasts

July 8, 2025

For under $100, you can get your hands on top tools from Bosch, like the 12V Max Cordless Planer or 12V Max Cordless Multi-Tool.

Read more

Toronto’s tallest mass timber residential building tackles housing crisis

July 8, 2025

Toronto’s tallest mass timber residential building is going up fast with help from robotics, AI, and prefabrication at 230 Royal York.

Read more

Breaking the fall: Top strategies to prevent slips, trips, and falls

July 7, 2025

Slips, trips, and falls are leading causes of injury in construction. Proper training, awareness, and gear can prevent accidents and protect your team.

Read more

Top female-owned construction companies across North America

July 7, 2025

Female-owned construction companies like CTI Environmental and Bjork Construction are reshaping the industry to be more inclusive.

Read more